arrowbikebird_1bird_2bird_3bird_4buscalendarcar-frontcarclockclosecontentdown-arrowdownloaddropdownemaileventfacebookfileinformationinstainstagramleftlistingnewspagespages_iconpin-bus-mappin-frompin-solidpin-topinpinterest-2pinterestplayresetrightschool-bus-frontsearchticktreetree_2tree_birdstwitter-2twitterup-arrowwalkwarning
Search A vector graphic image of a search icon
Search A vector graphic image of a search icon

{{ alert.AlertText }} {{ alert.MoreInfoLink.Text }} x

Barkham Bridge.jpg

Barkham Bridge

Schedule of Work

Main Construction – Started Winter 2019

Open for Traffic (planned) – Spring 2021

Background

The Barkham Bridge project consists of a new bridge structure across the Barkham Brook and approximately 300 metres of associated carriageway realignment. The new bridge is to be constructed south of the existing Barkham Bridge within private land. The existing Barkham Bridge structure is to be retained and be converted to a shared footway/cycleway, connecting the existing sections of footway to the east and west.

Further information

For more detailed information about the project please click here.

During the construction period there will inevitably be some delays to general traffic in and around the Barkham area.  Whilst traffic moves more slowly there are some things to consider including other ways of travelling which can even earn you benefits as you travel.